Getting a flooring system put in the basement, but want to replace the 1967 bare copper line embedded in the concrete floor between the oil tank and the boiler first, so I don't have to cut through the new flooring a couple years from now. ~20 feet....shutoff, disconnect, evacuate fuel oil, chip out floor, replace with poly-coated and/or sleeved, pour back floor.
Licensed and insured only.
Licensed and insured only.