Yes it is accurate and correct which is why I mentioned being an outlier.Could you have mistyped your accepted date? The MSP was approving 8/4 on Thursday and just started on 8/5. An 8/7 approval is about 2-3 days early, which is unusual,
Yes it is accurate and correct which is why I mentioned being an outlier.Could you have mistyped your accepted date? The MSP was approving 8/4 on Thursday and just started on 8/5. An 8/7 approval is about 2-3 days early, which is unusual,
Same here. Submitted 8/4 accepted 8/12 nothing yet
What is this PTP?Yeah is the one in southern maryland but I get my renewal class free of charge for the troubles
I have to admit, I have not followed this thread too closely since my permit arrived. Thanks for tracking all this time, it was very helpful.Also, this is a fitting time to say I'm washing my hands of tracking data at this point.
We've got a pretty solid idea as to how this process works. Those that know and are interested can find the data themselves.
If someone else is interested in picking up the project, I'll be happy to help with a handoff of what I have.
Good luck, folks.
It does not. The app number was created when you submitted. The only date that has an appearance of mattering is the accepted date. The app number gives a general ideal of the quantity of apps submitted, not approved.i dont think the app # matters either im 22HGP0563** and still nothing
Nope not yet. I originally submitted 7/29 but my score card didn't upload so I had to resubmit. They accepted 8/12 haven't heard anything else yetYou mean both of you have also not had the NICS done either????
Sigh*im 8-5 still nothing permit #22HGP0563**
It only indicated the number of Applications that have been started, not necessarily submitted some never get submitted. It also gives an indication when the process was started but it may be weeks, months, and in at least one case years between when a app was started and when it was finally completed and submitted.It does not. The app number was created when you submitted. The only date that has an appearance of mattering is the accepted date. The app number gives a general ideal of the quantity of apps submitted, not approved.
The permit number gives us an idea of how many have been issued.
Correct, my bad. I meant started.It only indicated the number of Applications that have been started, not necessarily submitted some never get submitted. It also gives an indication when the process was started but it may be weeks, months, and in at least one case years between when a app was started and when it was finally completed and submitted.
2 Months is about what it's taking right now. With an 8/5 accept date you should hear something any dayI don't agree my app # is 22HGP0563** and I haven't heard shit date accepted 8-5 that's slacking if you ask me I'm pretty much at 2 months.
Maybe end of today, possibly tomorrow. Probably by Monday. Almost certainly Tuesday at the latest.2 Months is about what it's taking right now. With an 8/5 accept date you should hear something any day
Nope not yet. I originally submitted 7/29 but my score card didn't upload so I had to resubmit. They accepted 8/12 haven't heard anything else yet
Looks like they're working today.
APPROVED!!!
Submitted 7/27
Accepted 8/04
NICS 9/10
Approved 9/24 (woulda been yesterday but I had to resubmit one doc)
22HGP0270**
One good thing about all this waiting was visiting this site more and speaking with like minded individuals. Thank you all!
Are you expecting the MSP to notify you? That is not how it works. Go over to the Banter thread and post your complaints there.Nope not yet. I originally submitted 7/29 but my score card didn't upload so I had to resubmit. They accepted 8/12 haven't heard anything else yet
Card in the mailbox today, 9/24At long last!
Appication # 22 HGP0178**
Submitted: 7/31
Accepted: 8/3
NICS: 9/6
Approved: 9/20 Email rec'd @ 4:14pm
Permit# 22 HGP-0622**
edited to add application #