SkunkWerX
Ultimate Member
The Forms went to the Feds early/mid February.
Approval 7/21, got call 8/20 when they arrived at the FFL.
1 month mailing interval.
Got the stripped lower assembled and slapped on the upper.
Rather than cross-post identical info, here is the thread (with pic) in the IP section.
http://www.mdshooters.com/showthread.php?t=89993
Now to work on a viable subsonic load. Have [500] 220 grainers just waiting.
Approval 7/21, got call 8/20 when they arrived at the FFL.
1 month mailing interval.
Got the stripped lower assembled and slapped on the upper.
Rather than cross-post identical info, here is the thread (with pic) in the IP section.
http://www.mdshooters.com/showthread.php?t=89993
Now to work on a viable subsonic load. Have [500] 220 grainers just waiting.