DZ
Ultimate Member
What work is typically performed (other than cutting/threading) for this install?
I saw mention welding the bolt handle to the bolt because they are silver soldered at the factory. Is this typically done by most of the custom shops?
Here is a link to the shop that welds the handle in place: http://www.accu-tig.com/
I saw mention welding the bolt handle to the bolt because they are silver soldered at the factory. Is this typically done by most of the custom shops?
Here is a link to the shop that welds the handle in place: http://www.accu-tig.com/