In need to start new electical service in Robbins, Dorchester County. Choptank electric requires the installation of 200amps meter socket on a pole.
It sounds like 200amps and underground connection (10 ft to existing pole) is required. The parcel will have RV camper, so besides the meter we will need a breaker box and several receptacles for RV.
It sounds like 200amps and underground connection (10 ft to existing pole) is required. The parcel will have RV camper, so besides the meter we will need a breaker box and several receptacles for RV.